Facilitators can update the status of action items and copy action items from a previous assessment to a new assessment (e.g. from Project Definition Rating Index (PDRI)-2 to a PDRI-3 assessment or from Construction Readiness Assessment (CRA) conducted at 60% Design Complete to an assessment conducted at 90% Design Complete).

Action Items can only be copied between assessments of the same assessment type within the same project. For example, action items cannot be transferred from a PDRI to a Commissioning & Startup Readiness (CSU) Assessment.
When creating a new assessment, users will see the option to Copy the Action Items from the last PDRI/CRA/CSU for this project. By default, this will be checked.