Average PDRI Project Scores

Average PDRI Project Scores

Projects by PDRI Score

The Projects by PDRI Score chart is accessed by clicking on the Project tab within the PDRI Analytics section. This chart illustrates how projects are performing in relation to industry benchmarks and other projects of this type.

Projects by PDRI ScoreProjects by PDRI Score

PDRI assessments have a recommended score range based on the stage the assessment was conducted. Higher scores generally indicate a higher level of risk. This can be a leading indicator of project outcomes.

This chart indicates which projects are at risk based on their PDRI score at a given stage and gives an overall view of performance in comparison to similar projects at the same stage. Clicking on the project name allows users to drill down into the assessment details for further analysis.

This view can also be filtered to identify trends based on portfolio, project manager, client, project type, location, etc.
This chart can also be accessed by clicking on a PDRI stage (PDRI 1, PDRI 2, PDRI 3) on the Y-axis of the “Average PDRI Score by Stage” from the “Summary” tab.

Projects by Maturity & Accuracy Score

If the Template Type "PDRI - Industrial" is selected, the option to view the Maturity & Accuracy score will be available.

Projects by Maturity & Accuracy Score

Industrial projects have an additional set of scoring indicators that illustrate the level of maturity in Front End Engineering Design (FEED). This chart plots each assessment for the selected PDRI Template and PDRI Stage on the chart based on their Maturity & Accuracy score and can help do determine whether an organization is providing sufficient time and resources to define engineering documents, outputs and deliverables.

The user can place their cursor over the number on the graph to view the project and the associated Maturity & Accuracy score.
  1. Maturity score: There are 46 factors that indicate the level of maturity during FEED (Front End Engineering Design). A higher maturity score indicates better scope definition. The target maturity score at the end of Detailed Scope (PDRI 3) is 80% or higher.
  2. Accuracy Score: The 27 factors that contribute to the Accuracy score which measure how the work gets done – the people, teams, processes and resources that contribute to a mature FEED. The target score at the end of Detailed Scope (PDRI 3) is 76%.
Below the chart, a table displaying each project and its associated Maturity and Accuracy score is listed.
The user can click on the project name to drill down into the assessment details.

Projects by Accuracy Score

If a Template Type with one of the following templates is selected, the option to view the “Projects by Accuracy Score” chart will be available. 
  1. PDRI Building V4.1
  2. PDRI Infrastructure V4.1
  3. PDRI for Manufacturing & Life Sciences V1.1 

Projects by Accuracy Score

The Accuracy section is a fourth section that appears on these assessment templates listed above.  The 27 factors that contribute to the Accuracy score measure how the work gets done – the people, teams, processes and resources that contribute to a mature scope. The target score at the end of Detailed Scope (PDRI 3) is 76%.

This graph quickly identifies how your project leadership, execution team, processes and resources are performing in relation to each project of this type and the industry benchmark score of 76%.

    • Related Articles

    • Average PDRI Category Scores

      Average Category Score The Category tab shows Average Category Scores to highlight which categories are showing the most risk for the selected Template Type at the selected PDRI stage. Average Category Score Each section of the PDRI assessment ...
    • Average PDRI Element Scores

      Average Element Score The Element tab displays the Average Element Score for the selected Template Type and PDRI Stage. Users can view the top 5, top 10 or all element scores within the assessment. Depending on the Template Type selected, users may ...
    • Average PDRI Section Scores

      The chart displayed on the Section tab illustrates the Average Section Score and can help to highlight what area of Front End Planning an organization is experiencing the most challenges (if any). Average Section Score PDRI assessments contain three ...
    • PDRI Analytics Overview

      If your organization has invested the time to implement and standardize these CII practices into your Capital Project Lifecycle, you have a tremendous opportunity to leverage the data with the powerful benchmarking and analytics capabilities included ...
    • PDRI Summary Analytics

      Average PDRI Score by Stage The Summary tab shows the Average PDRI Score by Stage and illustrates any stages of the front end planning process an organization may be seeing challenges. Average PDRI Score by Stage Graph PDRIs can be used at multiple ...