Default Colours and Ranges for Construction Readiness (CRA)
The Construction Readiness Assessment templates have default score range colours to serve as a guide to users. The default ranges and colours are listed in the table below:
Construction Readiness & Construction Readiness - Smaller Projects Templates:
Minimum Score | Maximum Score | Colour |
0% | 0% | White |
0% | 75% | Grey |
75% | 85% | Yellow |
85% | 100% | Green |
A screen capture of the Default values for the Construction Readiness Templates is shown below.
Manage Score Range Colours (CRA) The white range (0-0) allows users to identify excluded categories, or categories where all factors are listed as N/A.
These default colours and ranges can be
modified as necessary.
Related Articles
Modifying Construction Readiness (CRA) Score Ranges and Associated Colours
It is possible to modify the default colour representing the project score and the numerical range for that colour, and the number of intervals included. The default in Carve compares the project score to the Construction Industry Institute (CII) ...
Default Colours and Ranges for Commissioning & Operational Readiness
The Commissioning templates have default score range colours to serve as a guide to users. As a default, these values are the same for each gate (Commissioning Phase). The default ranges and colours are listed in the table below: Minimum Score ...
Default Colours and Ranges for PDRI Dashboard
Carve starts with default colours attributed to ranges of scores for PDRI results. The default ranges and colours are listed in the table below: Industrial, Building, & Infrastructure Templates: Gate Minimum Score Maximum Score Colour PDRI-1 0 800 ...
Managing Score Ranges Overview
Pictorial representations in Carve provide users a quick indication of PDRI, Construction Readiness, and Commissioning & Operational Readiness results and how the current project compares with either industry standards or internal benchmarks. PDRI ...
Modifying Commissioning & Operational Readiness Score Ranges and Associated Colours
It is possible to modify the default colour representing the project score and the numerical range for that colour, and the number of intervals included. Admin users can also adjust the category-level target scores for the each Commissioning phase. ...