Enter PDRI Assessment Attendees
Knowing who attended the PDRI Assessment can provide insight on the PDRI score. For example, if a key project stakeholder was not able to attend the assessment, it may impact the overall score for their area(s) of expertise. Make note of key stakeholders who were not able to attend the PDRI Assessment.
Import Attendees
Please refer to the
Import Attendees article for full details on how to upload attendee information through a CSV file.
Add New Attendees
- From the Attendees tab, select Create Attendee
- On the Create Attendee pop-up enter the following information:
- Name (required)
- Organization – often front-end planning teams include team members from several organizations (e.g. owner, design contractor, consultant)
- Role – enter the attendee’s project role (this may or may not be their job title at their organization)
- Contact
- Email
- Click Save
Create Attendee Edit and Delete Attendees
To edit attendee information:
- From the Attendees tab, select the down arrow beside the name of the attendee to be edited.
- Select Edit.
- Update the required fields.
- Click Save.
To delete an attendee:
- From the Attendees tab, select the down arrow beside the name of the attendee to be edited.
- Select Delete.
- Select OK to confirm the deletion.
Related Articles
Steps to Prepare for a PDRI Assessment
Carve’s facilitation steps are based on PDRI facilitation best practices from CII. Facilitators can either: Complete the entire facilitation process using Carve Use CII’s PDRI spreadsheet templates to collect assessment data and import into Carve ...
Enter the PDRI Session Details
The default tab of the Assessment dashboard is the Session Details. In the Session Details tab, enter the following information: Project Gate (pre-populated with the selected Project Gate while creating the assessment) Project Status Assessment Date ...
Export PDRI Assessment Element Details
To support due diligence efforts, PDRI Assessment elements are often referenced in project documentation. To facilitate this process, users can export element details from the assessment summary view. This export includes the following columns: ...
Create a PDRI Assessment
If a new project is being created, the user will be prompted to create the assessment at the same time. Refer to section Create a Project. To create an assessment in a pre-existing project: 1. Locate the project and click the project name 2. Click ...
Capturing PDRI Action Items
During a Project Definition Rating Index (PDRI) assessment, enter applicable action items by clicking the Action Items button, as shown in the image below. Action Items in Facilitation View Capture Action Items in Facilitation View Beneath the Action ...